Put your name on the deliverable
Add company details and a logo. Pro includes white-label output and twelve Engineer report themes with colour and font controls.
Product tour
Follow the real project sequence through evidence capture, calculation, plant sizing, schematics, quotation and reporting. Nothing plays until you press it.
Set your company identity once, then choose the presentation of your Engineer reports.
Add company details and a logo. Pro includes white-label output and twelve Engineer report themes with colour and font controls.
Capture requirements, measurements, notes and evidence in a guided visit before any of it is allowed to become engineering input.
Work through two or three questions at a time, add section notes and evidence, then submit a frozen record for engineering review and explicit application.
Start from what the client actually sent you — a written brief, a PDF, a plan or a sketch — rather than retyping it into a form.
Paste or upload a brief, review extracted values and inferences, choose the target pools and apply only your selected inputs.
Upload a plan or a sketch and the geometry is read from it — dimensions, shape and surface area — with the result shown against the drawing you gave it.
Use the project location and a selected hourly archive period to compare the weather cases that inform the load.
Choose the archive period and percentile basis, compare temperature-led and wind-led cases, then review and confirm the inputs to apply.
Size the plant that meets the load — heating, filtration and circulation — with filtration evaluated using versioned Lydmera screening assumptions whose scope is disclosed.
Configure heating plant for each pool independently, or as a single combined plant serving several — on the same project, without rebuilding it.
Enter pipe runs and bores and see flow velocity and pressure loss as you go, checked against the limits rather than after the fact.
Use AI to extract a published rating, check its air, water and humidity conditions against the source, then assess suitability for your project.
Review duty rows and source notes, correct saved values and check the primary and pool-side rating conditions before project use.
Set electric heating capacity and see installed duty against the required load, including the margin applied.
Import published flow and head tables, review the saved points and check the duty range and required pump evidence before selecting equipment.
A schematic you arrange and approve, where what prints is what you signed — and stops being approved the moment it changes.
Arrange the schematic, add notes and accessories, and approve it. Change the drawing afterwards and the approval lapses rather than printing quietly.
Turn the selected design into a clear commercial document without merging it into the engineering report.
Price selected equipment and manual materials, labour and services. Set commercial terms, review changes and freeze each issued PDF revision.
Issue the work as a branded engineer report, with the same figures available as a spreadsheet and a data export.
Choose the Engineer report theme and sections, generate the branded PDF, then export the same project values as spreadsheet and CSV data.
The same project, in the units and the presentation your client expects.
Switch display and report units between metric and imperial, and choose light or dark application appearance. Engineer report themes have their own settings.
Pool-water thermal sizing, circulation screening and reviewed equipment selection, with clear project inputs and results.
MethodologyCard required. Cancel before the trial ends to avoid being charged — Checkout and your account show the exact date and time.
Optional visits and sales analytics
With your permission, Google Analytics measures visits to our home, features, pricing and product tour pages. For up to 30 days, we also link those visits to a successfully sent sales enquiry, an activated trial or a first paid subscription. We send outcome counts and campaign labels, never your name, email, message, account identifier, project or payment details. Advertising personalization stays off. Your choice does not affect access to Lydmera; change it here or in the footer.
Cookies and privacy information